Playground and Splashpad Design/Build

Project Details
| Project: | Riverside Indian School Playground and Splashpad Design/Build |
| Location: | Anadarko, OK |
| Client Name: | Riverside Indian School |
| Contract Value: | $879,317 |
| Period of Performance: | On-track July 2024 |
Project Narrative
This was a task order for the BIA Western MATOC. The PBC design team worked with the client on the design: Presenting sample designs with desired elements and making changes to suit. There were three phases of design to reach a final product including the school logo on the water tank. The site prep began with earthwork and underground work. The preparation included poured in place safety surfacing and concrete curb. Currently, we are waiting for the equipment delivery on 18JUN2024 to complete the installation.